DIRECTION 5750007-1EN, REV. 1 LOGIQ E10 BASIC SERVICE MANUAL
8 - 14 Section 8-4 - Loading / Reloading / Upgrading the Software
5.
Once the Base Software Load is complete,
the system will display the following
message.
Please press any key to shutdown.
Remove media prior to system restart.
6.
You will see several screens as the
Application Software is being loaded; let it
run.
At this point, the load time will be
approximately 20 minutes.
7.
Once the Application Software installation
is complete the LOGIQ E10 will restart
twice.
When the LOGIQ E10 restarts, it will be
active and ready for testing and set-up.
Table 8-7 Loading Software all Partitions
Steps Corresponding Graphic