DIRECTION 5750007-1EN, REV. 1 LOGIQ E10 BASIC SERVICE MANUAL
Chapter 8 Replacement Procedures 8 - 377
Calibration and adjustments
No calibrations or adjustments are needed after this part replacement.
Verification
Perform the following steps to verify that the product is functioning as intended after this replacement:
1.) Connect cables and Probes removed earlier.
2.) Power up the system to verify that it operates as intended.
3.) Insert and play DVD to confirm proper operation of the DVD drive.
Functional Checks
Perform the following functional checks to confirm the system is operational before returning the system
to the customer.
Table 8-384 DVD R/W drive replacement Functional Checks
See:
Section
Functional Check Debrief Script
4-2-3 Power ON/Boot Up
LOGIQ E10 Basic Service Manual, Direction
5750007-1EN, Rev. 1. Leakage Current
measured at (record the value) and meets
allowable limits. Equipment passed all required
checks and is ready for use.
4-2-7 Probe/Connectors Checks
10-7-4 Grounding continuity
4-2-4 Power SHUT DOWN