DIRECTION 5750007-1EN, REV. 1 LOGIQ E10 BASIC SERVICE MANUAL
8 - 404 Section 8-15 - V Nav Roll Stand Assembling or Replacement
Calibration and adjustments
No calibrations or adjustments are needed after this part replacement.
Verification
Perform the following steps to verify that the product is functioning as intended after this replacement:
1.) Connect cables and Probes removed earlier
2.) Power up the LOGIQ E10 to verify that it operates as intended.
Functional Checks
Perform the following functional checks to confirm the LOGIQ E10 is operational before returning the
LOGIQ E10 to the customer.
Table 8-399 V Nav Roll Stand Assembling or Replacement Functional Checks
See:
Section
Functional Check Debrief Script
4-2-3 Power ON/Boot Up
LOGIQ E10 Basic Service Manual, Direction
5750007-1EN, Rev. 1. Equipment passed all
required checks and is ready for use.
4-2-6
Brakes and Direction Lock Functional
Checks
4-2-4 Power SHUT DOWN