EasyManua.ls Logo

GE ReadyToProcess WAVE 25 - Page 149

GE ReadyToProcess WAVE 25
172 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ActionStep
Follow applicable national and/or local regulations for disposal of the Cellbag
bioreactor.
5
Turn off all gas supplies.6
Shut down the system
Follow the instructions below to shut down the system.
ActionStep
Disconnect the software from the system in UNICORN.1
Press the power button on the rocker front panel. The light flashes green
while shutting down.
Note:
If the rocker fails to shut down, keep the power button pressed in more than
4 seconds to force a shutdown.
2
Clean the bioreactor system units.3
ReadyToProcess WAVE 25 Operating Instructions 29009597 AD 149
5 Operation
5.4 Perform cultivation
5.4.3 End a run

Table of Contents

Related product manuals