EasyManuals Logo

GE ReadyToProcess WAVE 25 User Manual

GE ReadyToProcess WAVE 25
172 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #114 background imageLoading...
Page #114 background image
5.1.5 Prepare the pump
Tubing holder positions
The pump head has two different holder positions to accommodate tubing with different
sizes. The inner position is for small tubing and the outer position is for large tubing (see
Pump tubing sizes, on page 114).
Outer position for large tubing
Inner position for small tubing.
Pump tubing sizes
The table below lists tubing sizes supported by ReadyToProcess Pump 25, with the range
of flow rates provided by each size. The wall thickness of the tubing should be 1.6 mm
(1/16").
Pump tubing is not supplied with the system. Suitable tubing must be pur-
chased separately.
Note:
114 ReadyToProcess WAVE 25 Operating Instructions 29009597 AD
5 Operation
5.1 Set up the system
5.1.5 Prepare the pump

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE ReadyToProcess WAVE 25 and is the answer not in the manual?

GE ReadyToProcess WAVE 25 Specifications

General IconGeneral
BrandGE
ModelReadyToProcess WAVE 25
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals