EasyManuals Logo

GE ReadyToProcess WAVE 25 User Manual

GE ReadyToProcess WAVE 25
172 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #129 background imageLoading...
Page #129 background image
5.2.4 Configure system settings
Pump roles need to be assigned to the individual pump heads before starting a run. This
is done in System Settings, which also allows definition of other system parameters
such as:
whether heating should be automatically enabled when the rocking starts (IC 2.0.4.0
and lower versions)
whether heating should be automatically disabled when the rocking starts (IC 2.0.5.1
and higher versions)
whether calibration values for pH and/or DO sensors should be reset at the end of
the run
whether rocking, gas mix and temperature control should be resumed on restart
after power loss
whether voltage or current should be used for analog inputs
Follow the instructions below to assign pump roles. See System settings, on page 70 for
general instructions on how to configure the system settings.
ActionStep
Select System:Settings in the System Control module.1
Select Pump setup from the list and click the + symbol to view the available
pump heads.
2
ReadyToProcess WAVE 25 Operating Instructions 29009597 AD 129
5 Operation
5.2 Start and configure the system
5.2.4 Configure system settings

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE ReadyToProcess WAVE 25 and is the answer not in the manual?

GE ReadyToProcess WAVE 25 Specifications

General IconGeneral
BrandGE
ModelReadyToProcess WAVE 25
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals