4.1 Site preparation
About this section
This section describes the site planning and the preparations necessary before installation
of ReadyToProcess WAVE 25. The purpose is to provide planners and technical staff with
the data needed to prepare the laboratory for the installation.
In this section
See pageSection
754.1.1 Delivery and storage
764.1.2 Site requirements
814.1.3 Client computer specifications
74 ReadyToProcess WAVE 25 Operating Instructions 29009597 AD
4 Installation
4.1 Site preparation