EasyManua.ls Logo

GE ReadyToProcess WAVE 25 User Manual

GE ReadyToProcess WAVE 25
172 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
ReadyToProcess WAVE
25
Operating Instructions
Original instructions

Table of Contents

Questions and Answers:

GE ReadyToProcess WAVE 25 Specifications

General IconGeneral
BrandGE
ModelReadyToProcess WAVE 25
CategoryLaboratory Equipment
LanguageEnglish

Summary

1 Introduction

About this manual

Describes the manual's purpose, scope, and conventions for using the system.

Important user information

Crucial safety and operational guidelines, including intended use and prerequisites.

Regulatory information

Lists applicable regulations, standards, and manufacturing information for the system.

Important concepts

Defines key terms and abbreviations used throughout the manual.

User documentation

Lists available documentation resources for the ReadyToProcess WAVE 25 system.

2 Safety instructions

Safety precautions

Details general and specific safety measures to prevent hazards during operation.

Labels

Explains various labels and symbols found on system units for identification.

Emergency procedures

Outlines steps for emergency shutdown and actions in case of power failure.

Recycling information

Provides guidance on product disposal and environmental considerations.

Declaration of Hazardous Substances (DoHS)

Information on hazardous materials and their management according to Chinese standards.

3 System description

System overview

General introduction to the ReadyToProcess WAVE 25 system and its intended use.

ReadyToProcess WAVE 25 rocker

Description of the main unit, its components, and front/rear views.

ReadyToProcess CBCU

Description of the control unit for gas mix, pH, and DO, including front/rear views.

ReadyToProcess Pump 25

Description of the peristaltic pump unit, including front and rear views.

Cellbag bioreactor

Details about the disposable culture container, including options and illustration.

UNICORN software overview

Introduction to the control and monitoring software modules and their functions.

4 Installation

Site preparation

Planning and preparations needed before system installation, including delivery.

Hardware installation

Steps for physically installing and connecting system components.

Software installation

Procedures for installing and configuring the UNICORN software and e-license.

5 Operation

Set up the system

Instructions for preparing the system for cell cultivation, including tray and sensors.

Start and configure the system

Steps to start, log on, connect, and configure the system and software.

Prepare for cultivation

Procedures for getting the system ready for cell culture, including medium and sensors.

Perform cultivation

Guidance on running and monitoring cell cultivation, including inoculation and harvest.

6 Maintenance

Calibration

Procedures and schedule for system calibration to ensure proper function.

Cleaning

Guidelines for cleaning system units to prevent microbial or cross contamination.

Cleaning before planned service

Specific cleaning requirements and forms for service personnel.

7 Troubleshooting

ReadyToProcess WAVE 25 system

Common issues and solutions for the overall system, including unit recognition.

ReadyToProcess WAVE 25 rocker

Troubleshooting specific to the rocker unit's functions like rocking and temperature.

ReadyToProcess CBCU

Troubleshooting for the gas mix, pH, and DO control unit's status indicators.

ReadyToProcess Pump 25

Troubleshooting for the peristaltic pump's status indicators.

UNICORN System Control

Issues related to software control, user access, and system connectivity.

8 Reference information

Chemical resistance

Lists approved chemicals for cleaning and disinfection of the bioreactor system.

Health and Safety Declaration Form

Forms required for on-site service and product return, detailing safety compliance.

Related product manuals