EasyManuals Logo

GE ReadyToProcess WAVE 25 User Manual

GE ReadyToProcess WAVE 25
172 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #84 background imageLoading...
Page #84 background image
4.2.1 Unpack the system units
Unpacking instruction
Follow the instructions below to unpack each box and to lift the system units onto the
bench.
ActionStep
Place the box on a smooth and flat surface with the correct side facing up-
wards.
1
Open the packaging with a knife and remove the pieces of foam from around
the system unit.
2
Lift the system unit by the handles on each long side and place it on the
bench.
3
Keep each unit in an upright position during unpacking. Protect units from
bumping into other objects.
Note:
NOTICE
The rocker has a scale function (load cells) and should therefore
be handled with extra care. The rocker shall not be placed on any
parts that may move. Avoid exposing the load cells to lateral forces,
such as pushing it sideways on the bench, which may cause distur-
bances in the measurement, or damage the load cells.
CAUTION
Heavy object. Because of the significant weight of ReadyToProcess
WAVE 25 rocker, assistance from another person is highly recom-
mended when lifting or moving the equipment. Use the handles
on the sides of the rocker when possible, and do not lift
ReadyToProcess WAVE 25 rocker with tray attached.
84 ReadyToProcess WAVE 25 Operating Instructions 29009597 AD
4 Installation
4.2 Hardware installation
4.2.1 Unpack the system units

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE ReadyToProcess WAVE 25 and is the answer not in the manual?

GE ReadyToProcess WAVE 25 Specifications

General IconGeneral
BrandGE
ModelReadyToProcess WAVE 25
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals