EasyManuals Logo

GE ReadyToProcess WAVE 25 User Manual

GE ReadyToProcess WAVE 25
172 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #35 background imageLoading...
Page #35 background image
2.3 Emergency procedures
Introduction
This section describes how to perform an emergency shutdown of ReadyToProcess
WAVE 25. This section also describes the result in the event of power failure or network
interruption.
WARNING
Access to power switch and power cord with plug. Do not block
access to the power switch and power cord. The power switch
must always be easy to access. The power cord with plug must
always be easy to disconnect.
Emergency shutdown
In an emergency situation, stop the run in one of the following ways:
Stop the run from System Control by clicking the Stop icon, if UNICORN is in control
of the system.
Result: The current run is ended and the instrument will go to Ready state, indicating
that it is ready for a new run.
.
or
Switch off power by pressing the Power button on the rocker front panel.
Result: The run is interrupted. The light in the Power button is turned off.
ReadyToProcess WAVE 25 Operating Instructions 29009597 AD 35
2 Safety instructions
2.3 Emergency procedures

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE ReadyToProcess WAVE 25 and is the answer not in the manual?

GE ReadyToProcess WAVE 25 Specifications

General IconGeneral
BrandGE
ModelReadyToProcess WAVE 25
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals