No light: power is OFF.Green light: power is ON.
Normal and forced shutdown
If the Power button is pressed once, a normal shutdown is performed. If the button is
pressed and held, a forced shutdown is performed.
The following table describes normal shutdown and forced shutdown.
DescriptionType of shutdown
All processes are stopped. The system waits
for acknowledgement from the processes be-
fore shutting down the instrument.
Normal shutdown: press the Power
button once.
All processes are stopped. The instrument is
shut down immediately.
Forced shutdown: press and hold
the Power button.
Power failure
The result of a power failure or emergency shutdown depends on which unit is affected.
will result in...Power failure to...
The run is interrupted immediately.
The data collected before the power failure is
stored in the instrument and can be saved when
power returns.
ReadyToProcess WAVE 25
36 ReadyToProcess WAVE 25 Operating Instructions 29009597 AD
2 Safety instructions
2.3 Emergency procedures

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE ReadyToProcess WAVE 25 and is the answer not in the manual?

GE ReadyToProcess WAVE 25 Specifications

General IconGeneral
BrandGE
ModelReadyToProcess WAVE 25
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals