EasyManua.ls Logo

GE ReadyToProcess WAVE 25 - 4 Installation

GE ReadyToProcess WAVE 25
172 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 Installation
About this chapter
This chapter provides required information to enable users and service personnel to:
unpack the bioreactor system delivered from the factory
install the system units
install UNICORN 7.0 software
edit system properties
Read the entire installation chapter before starting to install ReadyToProcess WAVE 25.
NOTICE
The rocker contains load cells for weight measurements and should
be handled with extra care. Do not place the rocker on any parts
that may move. Avoid exposing the load cells to lateral forces, such
as pushing the unit sideways on the bench, which may cause dis-
turbances in the measurement or damage the load cells.
In this chapter
This chapter contains the following sections:
See pageSection
744.1 Site preparation
834.2 Hardware installation
904.3 Software installation
ReadyToProcess WAVE 25 Operating Instructions 29009597 AD 73
4 Installation

Table of Contents

Related product manuals