EasyManua.ls Logo

GE ReadyToProcess WAVE 25 - Page 115

GE ReadyToProcess WAVE 25
172 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Flow rate range
(mL/min)
1
Tubing holder positionTubing inner diameter
InchesMillimetres
0.01 to 4.6Inner1/500.5
0.02 to 8.6Inner1/320.8
0.07 to 28Inner1/161.6
0.15 to 58Inner3/322.4
0.24 to 95Inner1/83.2
0.34 to 135Outer5/324.0
4.3 to 170Outer3/164.8
1
Flow rates are limited in media control. Maximum flow rates can be achieved in manual control.
NOTICE
Using larger tubing with the tubing holder in its inner position will
reduce flow rate and tubing life.
Using smaller tubing with the tubing holder in its outer position will
not secure the tubing correctly and may lead to rupture.
Adjust tubing holder position
Use a pointed tool such as a ball pen to adjust the tubing holder positions on both sides
of the pump head. Follow the instructions below to change the tubing holder position.
ActionStep
Make sure that the pump is not running.1
Open the flip top of the pump head completely.2
Place the pointed tool in the small depression in the
tubing holder on one side of the pump head.
3
ReadyToProcess WAVE 25 Operating Instructions 29009597 AD 115
5 Operation
5.1 Set up the system
5.1.5 Prepare the pump

Table of Contents

Related product manuals