Prepare for tilt
When the system enters END mode, the tray prepares for tilt if System Settings:Rock-
er:Prepare for tilt at END is set to Yes. This moves the rocker to the mechanical end
position, which is 14 degrees from horizontal. This position can also be set by executing
the manual instruction Rocker:Prepare for tilt. See illustration below.
Tilt position
In order to facilitate tray change in system setup and sampling and harvest during and
after cell cultivation, it is possible to position the tray with the attached Cellbag bioreac-
tor(s) into an upright position called tilt position. Follow the instructions below to put the
tray into tilt position.
The tray is shown without attached Cellbag bioreactor in the images below.
NOTICE
Take care when tilting the rocker tray with full Cellbag bioreactor(s)
attached.
ActionStep
Prepare for tilt as described above or select the largest possible angle in
UNICORN. Do not tilt the tray from an angle lower than 12°.
1
ReadyToProcess WAVE 25 Operating Instructions 29009597 AD 49
3 System description
3.2 ReadyToProcess WAVE 25 rocker

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE ReadyToProcess WAVE 25 and is the answer not in the manual?

GE ReadyToProcess WAVE 25 Specifications

General IconGeneral
BrandGE
ModelReadyToProcess WAVE 25
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals