EasyManuals Logo

GE ReadyToProcess WAVE 25 User Manual

GE ReadyToProcess WAVE 25
172 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #68 background imageLoading...
Page #68 background image
Pump 25: 2A refers to the left-hand pump head on the pump unit with CAN ID 2.
Label the CBCU and pump units with their CAN ID settings to simplify correlation
of the physical units with the process picture.
Tip:
In dual mode, place the pumps connected to the left and right Cellbag biore-
actors on the left and right sides of the rocker respectively.
Actions in the Process Picture
pane
It is possible to interact with the Process Picture pane in the following ways:
then...If you want to...
Hold the cursor over the right-hand side of the button,
and turn Reading and/or Control on or off as required.
You can only switch the Control setting if Reading is on,
and you cannot turn Reading off if Control is on.
Activate or deactivate
pH and DO measure-
ment and control
Click on the right-hand side of the button. The text on the
button shows the current value of the function.
Activate or deactivate
other functions
68 ReadyToProcess WAVE 25 Operating Instructions 29009597 AD
3 System description
3.6 UNICORN software overview
3.6.3 System control

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE ReadyToProcess WAVE 25 and is the answer not in the manual?

GE ReadyToProcess WAVE 25 Specifications

General IconGeneral
BrandGE
ModelReadyToProcess WAVE 25
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals