EasyManua.ls Logo

Hill-Rom Century+ P1400 - Preventive Maintenance

Hill-Rom Century+ P1400
277 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Preventive Maintenance
Chapter 6: General Procedures
Page 6 - 6 Century+™ Bed Service Manual (man241)
Preventive Maintenance
WARNING:
Only facility-authorized maintenance personnel should perform
preventive maintenance on the Century+™ Bed. Preventive
maintenance performed by unauthorized personnel could result in
personal injury or equipment damage.
The Century+™ Bed requires an effective maintenance program. We
recommend that you perform annual preventive maintenance (PM) and testing
for Joint Commission on Accreditation of Healthcare Organizations (JCAHO).
PM and testing not only meet JCAHO requirements but will help ensure a
long, operative life for the Century+™ Bed. PM will minimize downtime due
to excessive wear.
The following PM schedule guides the technician through a normal PM
procedure on the Century+Bed. During this PM process, check each item on
the schedule, and make the necessary adjustments.
Follow the PM schedule with the corresponding PM checklist. This checklist is
designed to keep a running maintenance history and subsequent repair costs for
one Century+Bed. However, your facility can modify this checklist or
design another to fit your needs. Keeping close records and maintaining the
Century+™ Bed are two effective ways to reduce downtime and ensure the
patient remains comfortable.
WARNING:
Powered bed mechanisms can cause serious injury. Operate the bed
only with persons clear of mechanisms.

Table of Contents