ACM 150
33
Un-switched outputs and plugs
76-215-13480-01-E
(CB number)
76-215-13480-01-F
(CB number)
76-215-13480-01-E
(CB number)
76-215-13480-01-F
(CB number)
J22 Relay board (F1) Relay board (F1) J32
Fans for top cabinet
(F1)
Fans for top cabinet
(F1)
J25 NOT USED (F1)
HMI PC and monitor
(F1)
J24
HMI PC and monitor
(F1)
NOT USED (F4)
J28
Fans for low cabinet
(F1)
Fans for low cabinet
(F1)
J27
Field Server
optional (F1)
NOT USED (F4)
J31
Sampling valve
board (F1)
Sampling valve board
(F1)
J30 Ethernet switch (F1)
NOT USED (F4)
J23
Cycle valves board /
SBC / FTIR Bench
(F1)
Cycle valves board /
SBC / FTIR
Bench(F1)
J33 Boost pump (F1) Boost pump (F4)
J26
NOT USED (F1) Ethernet switch (F1)
J21
Secondary pump
(F2)
Secondary pump
(F2)
J29
Field Server
optional (F1)
Field Server
optional (F1)
J20
Primary pump (F3) Primary pump (F3)
* Note: 76-215-13926-00-x for 115 VA
3.3.2. Interconnecting cables
On request, Honeywell can provide a wiring diagram showing all the power cords and
other interconnecting cables in the ACM 150 monitor and the connection points for each
cable. Refer to this diagram to determine which cord to unplug when removing power from
a specific pump or subassembly. Also, insert plugs into their receptacles, as shown on the
wiring diagram, when power is restored to a pump or subassembly.
NOTE
A 24 Vdc signal from the Sample Valve Control Panel goes to the Power
Distribution Panel at P1. This controls the Secondary Pump, turning on the power
when the inadequate vacuum is sensed. To change back to the Primary Pump,
switch the ACM 150 monitor from automatic to manual and back to automatic using
the Diagnostic menu.
3.4.
Air sampling system
3.4.1. ACM 150 flow cycles
The ACM 150 monitor is designed to move air samples from one area to the next as
quickly and efficiently as possible while ensuring that each sample is fresh and
representative of the air in the sampled area when analyzed. The Cycle Valves are shown
in Figure 9.
The ACM 150 monitor does this by sampling each area in four steps or flow cycles with
the following valves opened:
Evacuate: S1 and S6
Surge: S2 and S6
Fill: S2
Analyze: S1