F
a
(a) Call up sub-page for reduced folding.
a
b
c
d
¾ Select the working width of the folding boom
that shall be folded.
(a) Fold the selected working width of the
spraying boom (including locking, lifting,
lowering)
(b) Unfold the selected working width of the
spraying boom (including unlocking, lift-
ing, lowering)
(c) Fold outside wing
(d) Unfold outside wing
¾ The folding boom lights up green if it is fully
unfolded reduced and all locks are closed.
The message "Folding process success-
fully completed" is displayed.
NOTE
The correct resting of the spraying boom in the transport position must be veried on the control
terminal and the machine before road travel!
Flawless interlocking of the slope compensation and folding boom must be ensured!
16 17