EasyManua.ls Logo

Huawei NetEngine 8000 F

Huawei NetEngine 8000 F
729 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 4-133 Installed OT terminal
Install two OT terminals on a post.
Before you install two OT terminals on a post, ensure that the two terminals
can be installed on the post and that the electrical connecting pieces have a
large contact area. Two OT terminals can be installed using any of these
methods:
Bend the upper OT terminal at a 45- or 90-degree angle, as shown in
Figure 4-134.
Cross the two terminals, as shown in Figure 4-135.
Figure 4-134 Bending the upper OT terminal at a 45- or 90-degree angle
Figure 4-135 Crossing two terminals
HUAWEI NetEngine 8000 F
Hardware Guide 4 Hardware Installation and Parts Replacement
Issue 05 (2023-03-31) Copyright © Huawei Technologies Co., Ltd. 475

Table of Contents

Related product manuals