EasyManuals Logo

Husky Altanium Matrix5 User Manual

Husky Altanium Matrix5
248 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #226 background imageLoading...
Page #226 background image
v 1.0 — February 2020 Altanium Matrix5
214 Remove and Replace the Operator Interface
5. Securely hold the operator interface at the silver mounting pole and carefully lift the
unit from the top of the mainframe. Refer to Figure 15-22.
6. When you install the replacement operator interface, securely hold the operator
interface at the silver mounting pole when you lift it.
7. Put the operator interface on the top of the mainframe.
8. Align the four screw holes in the base plate with the holes in the top of the mainframe.
9. Install the four screws and tighten them with a #4 Phillips screwdriver.
NOTE: This step will require a screw driver short enough to clear the MCU located above
the two back mounting screws.
10. Connect the Power and Communication connectors that come from the controller
mainframe to the bottom of the MCU enclosure.
Figure 15-21 Operator Interface Screw Removal
Figure 15-22 Remove the Operator Interface

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Husky Altanium Matrix5 and is the answer not in the manual?

Husky Altanium Matrix5 Specifications

General IconGeneral
BrandHusky
ModelAltanium Matrix5
CategoryController
LanguageEnglish

Related product manuals