Mounting and commissioning
152 USER MANUAL FPC 200 - 3/2017
5.4 Device installation
Service conditions
The protective device is designed to be operated in demanding industrial and electrical utility environment. To be
compliant with EMC directive a commissioning instructions should be followed. It should also be noted that all the
contacts and relays that operate in the same cabinet, should be equipped with suitable surge suppression components. If
high voltage of 100 kV and above is present on a substation, a conductive shielding, grounded on both ends, should be
used in all external cables.
Dimensions
Figure 5.2 Device dimensions.