12. Unlock, power up and slowly, in manual mode, lower the platen assembly back down
onto the platen face, taking care that the RTD sensor (right rear side) is properly
reinstalled, wiring is not pinched and the pump outlet connector is properly aligned
(left center) until the platen core is resting fully onto the platen face. Shut down the
unit and lock out/ tag out both electrical and pneumatic supply.
13. Re-install the two bolts on either side of the outer edge to secure the platen face.
14. Unlock, power up and slowly, in manual mode, raise the platen assembly making
sure the platen face is secure. Raise to the full Up position, shut down and lock out/
tag out both electrical and pneumatic supply.
15. Re-install all remaining bolts and torque 30lbs/ft.
16. Unlock, power up and turn on heating zones. Ensure that the unit heats properly and
interfaces a drum properly before resuming production.