EasyManua.ls Logo

ITW Dynatec DM55 DynaDrum - Procedure to Resume Production after Use of Emergency Stop; Preparing a New Drum for Melting; Pneumatic Controls

ITW Dynatec DM55 DynaDrum
224 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ITW Dynatec
Chapter 5
Setting-up Operation, Daily Operation
Page 34 DM55 DynaDrum PP V6, Manual No.21-18, Rev.2.19
Procedure to Resume Production after Use of Emergency Stop
1. Twist and/or pull out the Emergency Stop Button to reset.
2. Acknowledge alarm message on Touch Panel.
Preparing a New Drum for melting
The adhesive level in a new drum must be at least 4” below the top rim of the drum.
This will allow the platen to be inserted and the platen seal to contact the drum.
If a heated platen is pushed into adhesive before seal contact is made, overflow will
occur.
Pneumatic Controls
Panel on Panel Box:
See description of buttons on next page.

Table of Contents

Related product manuals