Table 8: Site Preparation Checklist for SRX300 Services Gateway
Installation (continued)
NotesDatePerformed By
Additional
InformationItem or Task
“SRX300
Services
Gateway
Electrical Wiring
Guidelines” on
page 27
“SRX300
Services
Gateway Power
Specifications
and
Requirements”
on page 28
Measure the distance
between the external
power sources and
the device installation
site.
Locate sites for
connection of system
grounding.
Calculate the power
consumption and
requirements.
Rack Requirements
“SRX300
Services
Gateway
Rack-Mounting
Requirements
and Warnings”
on page 19
Verify that your rack
meets the minimum
requirements.
Rack Installation
“Preparing the
SRX300
Services
Gateway for
Rack-Mount
Installation” on
page 39
Plan the rack location,
including required
space clearances.
Secure the rack to the
floor and building
structure.
Cabinet Requirements
“SRX300
Services
Gateway
Cabinet Size
and Clearance
Requirements”
on page 25
Verify that your
cabinet meets the
minimum
requirements.
Plan the cabinet
location, including
required space
clearances.
Wall Installation