SRX300 Services Gateway Clearance Requirements for Airflow and Hardware
Maintenance
When planning the installation site for the SRX300 Services Gateway, you need to allow
sufficient clearance around the device. Consider the following:
•
The SRX300 Services Gateway does not include a fan and uses natural convection
cooling. For the operating temperature of the services gateway to be optimal, the
airflow around the chassis must be unrestricted.
•
For service personnel to remove and install hardware components, there must be
adequate space at the front and back of the device. Allow at least 24 in. (61 cm) both
in front of and behind the device.
•
If you are mounting the device in a rack with other equipment, or if you are placing it
on the desktop near other equipment, ensure that the exhaust from other equipment
does not blow into the intake vents of the chassis.
Related
Documentation
• SRX300 Services Gateway Rack-Mounting Requirements and Warnings on page 19
• SRX300 Services Gateway Rack Size and Strength Requirements on page 23
• SRX300 Services Gateway Spacing of Mounting Brackets and Flange Holes on page 23
Copyright © 2016, Juniper Networks, Inc.24
SRX300 Services Gateway Hardware Guide