Table 8: Site Preparation Checklist for SRX300 Services Gateway
Installation (continued)
NotesDatePerformed By
Additional
InformationItem or Task
“Preparing the
SRX300
Services
Gateway for
Wall-Mount
Installation” on
page 40
•
Verify that the area
selected meets the
minimum
requirements.
•
Verify that you have
the required hardware
to proceed with the
installation.
Desktop Installation
“Preparing the
SRX300
Services
Gateway for
Desk-Mount
Installation” on
page 40
•
Verify that the area
selected meets the
minimum
requirements.
•
Plan the installation
location, including
required space
clearances and
airflow requirements.
Cables
•
Acquire cables and
connectors.
•
Review the maximum
distance allowed for
each cable. Choose
the length of cable
based on the distance
between the
hardware
components being
connected.
•
Plan the cable routing
and management.
Related
Documentation
General Site Installation Guidelines for the SRX300 Services Gateway on page 16•
General Site Installation Guidelines for the SRX300 Services Gateway
The following precautions help you plan an acceptable operating environment for your
SRX300 Services Gateway and avoid environmentally caused equipment failures:
•
For the operating temperature of the services gateway to be optimal, the airflow around
the chassis must be unrestricted. Allow sufficient clearance between the front and
back of the chassis and adjacent equipment. Ensure that there is adequate circulation
in the installation location.
Copyright © 2016, Juniper Networks, Inc.16
SRX300 Services Gateway Hardware Guide