EasyManua.ls Logo

Lucent Technologies CBX 500 - Configuring a Layer 2 Tunnel

Lucent Technologies CBX 500
888 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Beta Draft Confidential
Configuring ATM Over MPLS Gateway Solution on CBX 3500
Configuring a Layer 2 Tunnel Over MPLS Core Network
ATM Services Configuration Guide for CBX 3500, CBX 500, GX 550, and B-STDX 9000 1/19/059-51
Configuring a Layer 2 Tunnel
A Layer 2 tunnel is an end-to-end tunnel through the PSN tunnel, with endpoints on
ATMoMPLS gateway switches. It can be configured as either VNN or PNNI. In the
Layer 2 tunnel, circuits are dynamic. Since the Layer 2 tunnel behaves like a VNN
direct trunk or PNNI link, any circuit can be configured over it. In this case, the Layer
2 tunnel is statically configured and doesn’t use LDP.
Layer 2 tunnels endpoints must be configured on like ATM or Frame Relay endpoints
(ATM-ATM or FR-FR) on a CBX 3500 switch with POS cards installed and
configured.
To configure a Layer 2 Tunnel:
1. In the Network object tree, expand the instance node for the network that contains
the switch.
2. Expand the Switches class node and double-click on the instance node for the
switch.
3. The switch object tree appears in the Navigation Panel.
4. Right-click on Layer2 Tunnels and select Add. The Add Tunnel dialog box
appears (Figure 9-25).

Table of Contents

Other manuals for Lucent Technologies CBX 500

Related product manuals