(
(
Preparing 972 Harvest Header
(21'
to
36')
for
9000 Tractor
ASSEMBLY
1. Attach lift linkage supports
(A)
to
lower header legs with
5/8
x
1!4
ca
rriag
e
bolts,
lockwashers
and
nuts.
2. Attach center section of wear plate
(D)
to cutterbar
at
delivery opening. Longer guard bolts are
positioned at the correct locations.
3.
Attach
skid
shoes (8)
at
header
legs with 5/8 x
1Y2
carriage bolts
and
flange
nuts
.
4. Attach reel lift coupler to
hose
at header left leg.
o
•
A
B
21'
to
36'
972
HEADERS - WINDROWER COMPLETION PACKAGE
139