EasyManua.ls Logo

Manitou 200 ATJ - 50 H - Monthly Maintenance or Every 50 Hours of Service; Also Perform the Daily Maintenance; Injection Pipes, Fuel Hoses and the Hose Clamps; Reduction Gearbox Impermeability

Manitou 200 ATJ
158 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3 - 22
2
1
1
Â
50H - MONTHLY MAINTENANCE OR EVERY 50 HOURS OF SERVICE
ALSO PERFORM THE DAILY MAINTENANCE.
CHECK Injection pipes, fuel hoses and the hose clamps
IMPORTANT
Never smoke or approach with a flame during this check.
If there is doubt about the condition of the injection pipes, fuel hoses and hose clamps, have them replaced by an
authorised professional from the Manitou network.
- Open the left-hand turntable cover.
- Open the swivelling engine plate, OCCASIONAL OPERATION.
- Remove the engine grille
1
.
- Check the condition of all the injection pipes, fuel hoses and the tightening clamps.
- Check for fuel leaks.
- Put the engine grille back in place.
- Close the swivelling engine plate, OCCASIONAL OPERATION.
- Close the left-hand turntable cover.
CHECK Reduction gearbox impermeability
- Locate the reduction gearbox
1
on the rear axle.
- Check no oil is leaking from the reduction gearbox and plugs.
- If a leak is detected:
• Clean the outside of the reduction gearbox with a clean cloth.
• Remove the filler plug
2
.
• Check that the oil reaches the filling hole.
• Add oil if necessary, LUBRICANTS AND FUEL.
• Refit the filler cap.
547399 (01/03/2019)
200 ATJ
www.duma-rent.com

Table of Contents

Other manuals for Manitou 200 ATJ

Related product manuals