5. INSTALLATION
Before installing the equipment:
• Remove the protective packaging of the various parts that make up the equipment;
• Remove any fasteners used for transportation.
5.1 EQUIPMENT INSTALLATION
5.1.1 GENERAL SAFETY PRECAUTIONS
The operations described in this paragraph must be performed by authorised personnel.
Unauthorised personnel must remain outside the installation area.
Make sure there is nothing around during installation of the various parts that
make up the machine (cables, pipes, etc.) that could cause interference or
danger to operators
.
Personnel in charge of all installation, connection, checks and verifications
must be trained to avoid incorrect operations that could damage the
machine
.
See the specific manuals for information on the integrated devices
.