CRIMP DATA ANALYZER
CDA10
REV.01
5.3.2 ELECTRICAL SYSTEM CHECKS
1. Check the electrical system in general and, in particular, check that all the cables inside the
electronic boards are correctly connected [see the relative electrical diagrams].
2. Check that the connector interfacing with the machine is correctly connected to the sensing
unit.
3. Check that the load cell sensor and encoder connectors are correctly connected to the
respective outlets on the sensing unit.