EasyManua.ls Logo

Mecal CDA10 - Checks and Verifications; General Checks on the Mechanical Units

Mecal CDA10
119 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CRIMP DATA ANALYZER
CDA10
REV.01
60
5.3 CHECKS AND VERIFICATIONS
Before starting the machine, carry out a series of checks and verifications in order to avoid
problems during its operation.
5.3.1 GENERAL CHECKS ON THE MECHANICAL UNITS
Perform a general visual inspection of the various units making up the machine, making sure that
there are no particular mechanical faults or foreign bodies.
Check that the machine parts and its guards have been properly anchored.
Verify that the handling parts are properly lubricated if they need to be.
CAUTION
Before making any movement, make sure that there are no faults in order to
avoid damage to the machine. Before cancelling any faults, check the cause
and eliminate it
.
HAZARD
These checks and verifications must be carried out with the machine stopped
and with all energy sources deactivated
.
NOTE
Contact the Manufacturer immediately if any problems are detected
.
CAUTION
Insulate the power cables by channelling them and divide them from the
signal cables to avoid electromagnetic interference. Follow the reference
standards
.

Table of Contents