CRIMP DATA ANALYZER
CDA10
REV.01
5.1.2 CHOOSING THE SITE AND VERIFYING INSTALLATION
REQUIREMENTS
The customer MUST prepare:
• A sufficiently large room, free from obstacles, equipped according to the safety regulations in
force in the user country.
• Proper ventilation and lighting.
• Appropriate lifting means.
• Operating spaces.
• Transit routes.
• Escape routes.
• Flooring capable of supporting the weight of the machine.
• A general power supply, including the earthing conductor, according to the characteristics and
tolerances required.
5.1.3 POSITIONING AND ASSEMBLING THE EQUIPMENT
See the attached layout to position the equipment on the machine.
The controller is positioned above the adjustable support, which in turn is fixed to the press frame
with two screws. There are different adapter holes, depending on the type of press on which
the swivel support is fixed.