CRIMP DATA ANALYZER
CDA10
REV.01
7. DISMANTLING
The following paragraph contains some recommendations and indications to correctly carry out the
operations for decommissioning, dismantling and removal of the equipment at the end of its
operating life.
• Make sure that there is enough space around the machine to allow personnel to perform all
necessary movements without risk;
• Move the machine switch to the OFF position (O);
• Disconnect the mains supply;
• Disconnect the connector from the control unit;
• Open the electrical box of the press and disconnect the cables;
• Disassemble the machine, proceeding downward for each unit. (paragraph 5).
• Remove the moving parts and, as much as possible, separate the various components by type of
materials (plastic, metal, etc.), to be disposed of through separate collection.
• Remove and move the machine parts from the work area taking all necessary precautions.
• Before lifting considerable size and/or weight components, check that the lifting devices are
correctly secured and use only suitable slings and equipment.
below are the sole responsibility of authorised
personnel
.
Be very careful of the possible falling of parts and/or components of the
machine during removal. This could cause serious harm to operators.
N
Disposal operations must be carried out in accordance with the regulations in
force in the country where the machin
e is installed.