15. Transportation
MiR250 Dynamic Integrator Manual (en) 09/2023 - v.2.1 ©Copyright 2020–2023: Mobile Industrial Robots A/S. 155
15. Transportation
This section describes how to lift the robot and how to pack the robot for transportation.
15.1 Lifting MiR250 Dynamic
To lift MiR250 Dynamic, follow these steps:
1 Remove the four M8 mounting bolts in the top plate of the robot. Use a T45 bit. Tighten
the bolts to 15 Nm when remounting them.