EasyManua.ls Logo

MIR MiR250 Dynamic - Transportation; Lifting Mir250 Dynamic

MIR MiR250 Dynamic
170 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15. Transportation
MiR250 Dynamic Integrator Manual (en) 09/2023 - v.2.1 ©Copyright 2020–2023: Mobile Industrial Robots A/S. 155
15. Transportation
This section describes how to lift the robot and how to pack the robot for transportation.
15.1 Lifting MiR250 Dynamic
To lift MiR250 Dynamic, follow these steps:
1 Remove the four M8 mounting bolts in the top plate of the robot. Use a T45 bit. Tighten
the bolts to 15 Nm when remounting them.

Table of Contents

Related product manuals