EasyManua.ls Logo

NEC VERSA P - Setup and Operation; Unpacking the System; Setup

NEC VERSA P
177 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Section 2
Setup and Operation
This section provides setup and operation information for the Versa P series system (in-
cluding cabling, power-on verification and using Auto Setup).
UNPACKING THE SYSTEM
Find an area away from devices that generate strong magnetic fields (electric motors,
transformers, etc.). Place the shipping carton on a sturdy surface and carefully unpack the
system. The carton contents include the system, AC adapter, AC power cord, battery, soft-
ware diskettes, and user documentation.
SETUP
When connecting power and signal cables, do the following.
1. Make sure that the system is powered off.
The power button turns the system on or off when it is pulled down. It is a spring-
loaded switch.
2. Observe connector alignment marks and keys (when present).
3. Connect the AC adapter cable to the power connector port as shown in Figure
Section 2-5.
4. Connect the end of the power cord to the AC input connector on the AC adapter.
5. Connect the other end of the power cord to an AC power source.
NOTE: If operating the system on DC power,
verify that the system has a charged battery pack
installed. For information on connecting the AC
adapter to recharge the battery pack during or
after use, see “Recharging the Battery Pack” in
the following section.
6. Ensure that all connections are properly seated and secure.
7. When removing or replacing cables, grasp and pull gently on the attached con-
nectors.

Table of Contents

Other manuals for NEC VERSA P

Related product manuals