EasyManua.ls Logo

Olympus OER-Pro - Page 63

Olympus OER-Pro
308 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 3 Inspection Before Use
57
ENDOSCOPE REPROCESSOR OER-Pro Operation Manual
4. When water supply starts, the TIME/CODE display on the main control
panel shows a [ ] mark spinning as shown below.
Figure 3.21
5. When the water supply is completed, the buzzer beeps three times and the
TIME/CODE display shows [10], which indicates 10 minutes. The time
displayed on the main control panel counts down every minute.
6. When the lid is unlocked, make sure that the water supply has stopped, and
then step on the foot pedal to open the lid.
7. Wipe off any water on upside of the leak test connector (black) in the
reprocessing basin with a clean cloth.
8. Connect the leak test air tube connector (black) (MAJ-821) to the
reprocessing basin’s leak test connector (black).
Figure 3.22

Table of Contents

Related product manuals