EasyManua.ls Logo

Olympus OER-Pro - Page 64

Olympus OER-Pro
308 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
58
Chapter 3 Inspection Before Use
ENDOSCOPE REPROCESSOR OER-Pro Operation Manual
9. Press the pin on the center of the metal connector of the leak test air tube to
confirm air supply.
Figure 3.23
10. Disconnect the leak test air tube from the reprocessing basin’s leak test
connector.
11. With another leak test connector (black), confirm air supply by repeating
from Step 7 to 10.
Figure 3.24
Pin

Table of Contents

Related product manuals