EasyManua.ls Logo

Perfect Point E-Drill - Draining of System for Storage or Transport

Default Icon
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15192 Triton Lane
Huntington Beach, CA 92649
Office Tel: 714-892-3400
Hotline Tel: 714-891-6533
www.ppedm.com
User Guide
Document No.
Revision:
107
Date:
10/18/2018
This document is the property of PPedm Corp. and contains proprietary and/or patented information and may not be reproduced in
part or in whole without the express written permission of the company. Perfect Point logo, Perfect Point
TM
and E-Drill
®
are
trademarks of PPedm, Corp. US and worldwide patents pending.
Page 56 of 76
3.11
Draining of system for storage or transport.
The Perfect Point E-Drill system should be protected from freezing cold conditions
that can crack or burst de-ionized water connections and plumbing. If the system is
subjected to freezing temperatures, it should be thoroughly inspected by a trained
technician for damage or leaks prior to use. If the system is to be stored or transported
in low temperature conditions, then it should be fully drained first.
To drain the system completely follow section 3.6 (Replace Filter). Before re-use
follow section 3.7 (System Bleeding and Charging) to refill the dielectric system.

Table of Contents

Other manuals for Perfect Point E-Drill