15192 Triton Lane
Huntington Beach, CA 92649
Office Tel: 714-892-3400
Hotline Tel: 714-891-6533
www.ppedm.com
This document is the property of PPedm Corp. and contains proprietary and/or patented information and may not be reproduced in
part or in whole without the express written permission of the company. Perfect Point logo, Perfect Point
TM
and E-Drill
®
are
trademarks of PPedm, Corp. US and worldwide patents pending.
3.11
Draining of system for storage or transport.
The Perfect Point E-Drill system should be protected from freezing cold conditions
that can crack or burst de-ionized water connections and plumbing. If the system is
subjected to freezing temperatures, it should be thoroughly inspected by a trained
technician for damage or leaks prior to use. If the system is to be stored or transported
in low temperature conditions, then it should be fully drained first.
To drain the system completely follow section 3.6 (Replace Filter). Before re-use
follow section 3.7 (System Bleeding and Charging) to refill the dielectric system.