15192 Triton Lane
Huntington Beach, CA 92649
Office Tel: 714-892-3400
Hotline Tel: 714-891-6533
www.ppedm.com
This document is the property of PPedm Corp. and contains proprietary and/or patented information and may not be reproduced in
part or in whole without the express written permission of the company. Perfect Point logo, Perfect Point
TM
and E-Drill
®
are
trademarks of PPedm, Corp. US and worldwide patents pending.
re-install the bowl after O-ring seal is rectified.
G)
When the tank is full the pump will automatically turn off. You may need to
add more water to fully fill the tank.
Note: The pump may be stopped manually by pressing the Empty Sediment Tank
button a second time.
Note: The Empty Sediment Tank function only drains the Sediment Tank for
servicing. It does not empty the entire system.
Rear of MSU with Filter Assembly in rotated position
3.6
Replace Filter:
Completely emptying the system for replacement of the system filter is accomplished
in the Replace Filter function. Procedure is as follows: