EasyManua.ls Logo

Perfect Point E-Drill - Empty Sediment Tank

Default Icon
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15192 Triton Lane
Huntington Beach, CA 92649
Office Tel: 714-892-3400
Hotline Tel: 714-891-6533
www.ppedm.com
User Guide
Document No.
Revision:
107
Date:
10/18/2018
This document is the property of PPedm Corp. and contains proprietary and/or patented information and may not be reproduced in
part or in whole without the express written permission of the company. Perfect Point logo, Perfect Point
TM
and E-Drill
®
are
trademarks of PPedm, Corp. US and worldwide patents pending.
Page 49 of 76
CAUTION
Submersing the E-Drill, its mechanism, or any parts other than the Adapter will
destroy the E-Drill electronics and void the system warranty. Submerging the E-
Drill in water may also cause operator injury due to electrical shock.
When the Tank is full the Full LED indicator will illuminate green and the pump will
turn off automatically. The system is then ready for continued use.
Note: The Top-Off pump may be stopped manually by pressing the Top-Off button
a second time. Exiting the Maintenance Screen will also automatically turn
the Top-Off function off. However, a “Low Water level” condition can only be
cleared by completely filling the system, stopping the fill process manually or
exiting Maintenance Screen will not clear the error.
The Top-Off function will not work if the tank is already full.
3.5
Empty Sediment Tank:
The E-Drill is provided with a maintenance kit including a drain bowl, a Drain/Bleed
Tube Pair and a Filter Bowl Wrench for the two water tanks. These tools are used
when servicing the Sediment tank or Filter tank. Sediment tank cleaning is carried out
as follows:
A)
Disconnect the two Hand-Tool water connections on the back of the Power
Supply Cabinet and connect one end of the Service Drain/Bleed Tube Pair
to the Mobile Service Unit PRESSURE and VACUUM ports. Place the other
end of the Drain/Bleed Tube Pair in a 1-gallon container (minimum).
Only Submerge Adapter Tip

Table of Contents

Other manuals for Perfect Point E-Drill