EasyManuals Logo

Pitco SSH Series User Manual

Pitco SSH Series
94 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #52 background imageLoading...
Page #52 background image
PitcoSolsticeandSolsticeSupremeHighEfficiencyGasFryers
SG/SSHSeriesServiceManual 52
6. Check the supply gas pressure with the
manometer and compare the reading to the
Supply Gas Pressure table on page 52 to
determine what the incom
ing gas pressure
should be.
SupplyPressureTable
NAT LP
7 to 9 11 to 13
NOTE: You cannot adjust the supply gas
pressure at the unit. Anything
over/under the recommended
amount should be adjusted at the
facility’s main gas line.
7. When adjustment is complete:
a. Shut off the main gas supply line
b. Disconnect manometer.
c. Remove the test fitting.
d. Apply Teflon paste to gas supply plug.
e. Reinstall gas supply plug with a 3/16 inch
hex wrench.
f. Turn on the main gas supply line.
TakingaManifoldGasPressureReading
1. Unscrew and remove the gas manifold plug with
a 3/16 inch hex wrench.
2. Finger tighten the test fitting into the test port
3. Finish tightening the test fitting using a
7/16 inch open-ended wrench.
4. Connect the manometer.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Pitco SSH Series and is the answer not in the manual?

Pitco SSH Series Specifications

General IconGeneral
BrandPitco
ModelSSH Series
CategoryFryer
LanguageEnglish

Related product manuals