EasyManua.ls Logo

Pitco SSHLV Series User Manual

Pitco SSHLV Series
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Solstice Gas ROV Fryers
SSHLV Series
Service Manual
RETAIN AND STORE THIS MANUAL IN A SAFE PLACE FOR FUTURE USE
L22-392 R1 (10/14)

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Pitco SSHLV Series and is the answer not in the manual?

Pitco SSHLV Series Specifications

General IconGeneral
BrandPitco
ModelSSHLV Series
CategoryFryer
LanguageEnglish

Summary

Notice

General

Serial Numbers

Safety Information

Installation, Operating, and Service Personnel

Defines qualified personnel for installation and service.

Definitions

Defines key terms used throughout the manual.

Qualified and/or Authorized Operating Personnel

Specifies requirements for authorized equipment operators.

Qualified Installation Personnel

Specifies requirements for authorized equipment installers.

Shipping Damage Claim Procedure

Theory of Operation

The Matchless Ignition System

Details the components and function of the ignition system.

Auto Filtration Boards

Thermostats

Fryer Sequence Operation

Heating System

Safety System

Filter System (Manual Filtration Only)

Basket Lift (Optional)

Auto Top Off – ATO (Optional)

Automated Filtration (Optional)

Accessing Fryer for Servicing

Replacing the Controllers

Removing the Controller Front Panel Bezel

Steps to remove the controller front panel bezel.

Manual Operation of Drain and Return (Auto Filter Only)

Blocked Drain (Auto Filter Only)

Replacing the Relay Board and Paper

Checking Resistance

Checking the Resistance of the Transformer

Procedure to check transformer resistance using a multimeter.

Diagram Identifying Terminals for Second Resistance

Checking the Resistance of the DVI Switch

Checking the Resistance of the Hi-Limit

Checking the Resistance of the Temperature Probe

Replacing Temperature Probe

Replacing the Ignition Module and Hi-Limit

Replacing an Igniter/Pilot Assembly

Replacing Drain Valve with Actuator (Auto Filter Only)

Replacing the DC Power Supply

Replacing Transformer/Power Box

Changing Filter Pump Actuator

Testing the Auto Top Off Probe (if equipped)

Replacing the Auto Top Off Probe (If equipped)

Gas Conversion

Replacing the Return Valve

Replacing the Optional Flush Hose Assembly and Valve

Replacing the Waste Oil and Components

Removing Rear Mounting Bracket

Steps to remove the rear mounting bracket.

Removing the Check Valve

Removing the Filter Pump from the Motor

Replacing Seal Kit

Procedure for replacing the seal kit on the filter pump.

Replacing the Drain Line or Gasket

Replacing the Pump Relay and Circuit Breaker

Replacing the Circuit Breaker

Steps for replacing the circuit breaker on the filter pump.

Replacing the Pump Relay

Cleaning the Gas Valve Vent Tube

Checking the Gas Pressure

Taking a Supply Gas Pressure Reading

Procedure to measure the incoming gas supply pressure.

Taking a Manifold Gas Pressure Reading

Adjusting Manifold Gas Pressure

Adjusting Pilot Flame

Replacing the Self-Cleaning Burner Solenoid

Replacing the Gas Valve

Replacing the DVI Switch (Manual Filter Only)

Replacing the Burner Assembly

Replacing the Burner(s)

Steps for replacing individual gas burners.

Replacing the Burner Assembly

Replacing the Frypot

Replacing the Basket Lift Components

Removing the Basket Lift Cover

Steps to remove the basket lift cover.

Replacing the Basket Lift Transformer

Procedure to replace the basket lift transformer.

Replacing the Basket Lift Driver Board

Adjusting the Magnetic Sensor

Replacing the Basket Lift Actuator

Replacing the Filter Pump and Motor

Removing the Filter Pump and Motor

Steps to remove the filter pump and motor assembly.

Information Charts/Tables

Simplified Wiring Diagrams

Wiring Diagram – Heat Control Wiring Left & Right (ROV)

Wiring diagram for heat control circuits.

Wiring Diagram – Auto Filter Board (AFB2) Wiring (ROV)

Wiring Diagram – Connector Locations Detail AFB2 W/Jib & No Bulk Oil Option (ROV)

Wiring Diagram – Calibration Test Points and Indicators (ROV)

Wiring Diagram – AC & DC Control Voltage Supplies (ROV)

Wiring Diagram – Basket Lift Option & Connector Locations (ROV)

Wiring Diagram – Filter Pump Options 208V-240V (ROV)

Wiring Diagram – Full Vat with SCB

Wiring Diagram – Basket Lifts

Wiring Diagram – Filter Motor 115V-60Hz

Wiring Diagrams – Filter Motor 208-240V

Related product manuals