Pitco SSHLV (ROV) Gas Fryers
8.2 Diagram Identifying Terminals for Second Resistance
8.3 Checking the Resistance of the DVI Switch
1. Remove the Drain valve interlock (DVI)
connection.
2. Connect the multimeter to the DVI leads
and check the resistance.
DVI Resistance Table:
Valve Closed Valve Open
Near Zero Ohm Open Circuit
3. If measurements do not match the tables
above, replace the DVI, following
instructions in Section 29.
L22-392 R1 24
TAP Volts Resistance TAP Volts Resistance
10 - 6 24V 0.7 10 - 6 24V 0.6
Tap Volts Resistance Tap Volts Resistance
5 - 1 240V 30.4 5 - 1 480V 119.5
5 - 2 208V 25.3 5 - 2 440V 107.7
5 - 3 120V 9.9 5 - 3 380V 90.2
PP10429 PP10428
Secondary ResistanceSecondary Resistance
Primary Resistance Primary Resistance