Installing Line-Up-and-Match
‘l)pe
1
Battery Cabinets
Before beginning the following procedures, be sure you have prepared the UPS for
instatlation
of the battery cabinets (See page
17).
To
wjre
line-up-and-match
Vpe
1
battery cabinets together:
1.
All battery cabinets will arrive at your site with each battery connection string
electrically disconnected. Remove the screws that secure the left cable
connector, and remove the
tiewrap
securing the left wire plug. See Figure 20 for
connector and plug locations.
2. In the adjoining cabinet to the left, remove the screws securing the right cable
connector.
3.
Mate the left cable connector and left wire plug in battery cabinet
#I
to the right
cable connector and fixed right wire plug in the adjoining cabinet to the left.
See Figure 20 to locate the cutout for routing of battery cable and wire.
4. Repeat steps 1 through 3 for each battery cabinet to be joined.
To
wire
a
line-up-and-match
vpe
1 battery cabinet to the UPS:
1.
A UPS battery cable connector is supplied inside the UPS cabinet. It is
connected to terminals E4 and E5 and tiewrapped in place. Remove the screws
that secure the left cable connector, and remove the
tiewrapapsecuring
the left
wire plug. See Figure 20 for connector and plug locations.
2. Mate the left cable connector and the left wire plug
with
the UPS battery cable
connector and remote interface plug (ii supplied) inside the UPS cabinet as
shown in Figure 20.
3. After making sure that the battery breaker is in the OFF position, connect the’
battery strings in the battery cabinet by mating all disconnected battery drawer
connectors to the closest string connectors as shown in Figure 20.
4. Mount the right side panel (removed from the UPS) to the right side of the end
battery cabinet:
6.
Mount the hanger bracket to the top right side of the battery cabinet
b.
Hang the right side panel on the hanger bracket and
align
it
with the
front and rear of the battery cabinet
C. Secure the right side panel at
the
bottom.
5.
Replace the deadfronts and secure the UPS doors by reversing the applicable
steps from the UPS preparation procedure on page 17.
‘6.
Replace all battery cabinet center
deadfronts.
7. Attach a ground bus between joined cabinet frames using the procedure on
page 26.
6.
S%%~$~;ll
battery cabinets by reversing steps 1
-
3 of “To wire battery cabinets
I
Powerware Plus 80 UPS Installation Manual
33

Table of Contents

Related product manuals