EasyManua.ls Logo

Radwin WinLink 1000 - Chapter 3 Installation and Setup; Site Requirements and Prerequisites; Package Contents

Radwin WinLink 1000
174 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 3
Installation and Setup
This section describes the installation, alignment, and setup procedures
for a WinLink system.
Site Requirements and Prerequisites
For the IDU units, allow at least 90 cm (36 in) of frontal clearance for
operating and maintenance accessibility. Allow at least 10 cm (4 in)
clearance at the rear of the unit for signal lines and interface cables.
The ambient operating temperature should be –45 to 60°C/–49 to
140°F (ODU), or –5 to 45°C/23 to 113°F (IDU) at a relative humidity of
up to 90%, non-condensing.
Package Contents
The WinLink packages include the following items:
ODU package containing:
ODU
Mast/Wall mounting kit plus mounting instructions
CD-ROM [WinLink™ 1000 Manager, Installation and Operation
Manual, and Link Budget Calculator]
Self adhesive label showing the MAC address and the
alternative community string KEY. Keep this label safe.
Spare RJ-45 connector
IDU-E or IDU-R package containing:
IDU-E or IDU-R
AC/DC Converter
IDU wall-mounting drilling template
Self adhesive label showing the IDU LED operation
Spare RJ-45 connector
IDU-C Package containing:
IDU-C

Table of Contents

Other manuals for Radwin WinLink 1000

Related product manuals