EasyManua.ls Logo

Robopac ORBIT 16 - 4.5.2. CARRIERS INSTALLATION

Robopac ORBIT 16
95 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ORBIT 16
4.5.2.CARRIERS INSTALLATION
1. Remove packing from conveyors
2. Remove the screws that fasten the
conveyors.
3. Connect the conveyor and support it as
to prevent damage to the conveying
belt.
4. Lift the conveyor and screw the adjusting
legs to it.
5. Connect the infeed carrier to the base
and tighten the screws (C).
|
Note
Remember that the adhesive arrows on
conveyors indicate the normal operating
direction of the same.
i
Caution - Warning
During operation, be careful to not
damage the clamp unit.
43/95

Table of Contents

Related product manuals