EasyManuals Logo

Rotax 912 Series Installation Manual

Rotax 912 Series
199 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #129 background imageLoading...
Page #129 background image
d04924.fm
INSTALLATION MANUAL
BRP-Powertrain
Effectivity: 912 Series
Edition 2/Rev. 0
75-00-00
page 19
August 01/2012
3.2) Requirements, permissible location and installation position of the
radiator/expansion tank/overflow bottle
Radiator See Fig. 9.
Expansion tank To ensure proper operation of the cooling system, the expansion tank (1)
with pressure cap (2) in the main operating systems must be installed on
the highest point of the cooling circuit.
NOTE: The expansion tank (1) is fitted on top of the engine.
Graphic Permissible position
WARNUNG
WARNING
Non-compliance can result in serious injuries or death!
The radiator must be designed and installed such that
the permissible operating temperatures are main-
tained and the max. values are not exceeded.
This must also apply to “Hot day conditions“.
WARNUNG
NOTICE
If required, the radiator outlet (3) may be located max.
1.5 m (4.92 ft.) underneath the inlet elbow (4) of the
water pump and no higher than the expansion tank (1).
(see Fig. 9).
Part Function
1 Expansion tank
2 Radiator cap
3 Radiator outlet
max. 250mm /
max. 9.84 in.
max. 1,5 m /
max. 59.05 in.
2
1
4
5
6
3

Table of Contents

Other manuals for Rotax 912 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Rotax 912 Series and is the answer not in the manual?

Rotax 912 Series Specifications

General IconGeneral
Redline5800 rpm
TBO2000 hours
Displacement1211 cc
Bore79.5 mm
Stroke61 mm
Power Output80 hp (59.6 kW)
Compression Ratio9.0:1
Fuel TypeAvgas 100LL
Ignition SystemDual electronic ignition
Fuel SystemFuel Injected
Oil SystemDry sump
Engine Type4-cylinder, horizontally opposed, 4-stroke

Related product manuals