16
8012707/ZVF9/V2-1/2019-04 | SICKOPERATING INSTRUCTIONS | GM32
Subject to change without notice
3 PREPARING THE GAS DUCT SIDE
3.2 Overview of the installation steps (duct-side work)
Fig. 4: Example: Installation option
Special tools / auxiliary materials Part number Required for
Adjustment device 2034121 Alignment of "flanges with tube"
Jaw wrench
19 mm
24 mm
--- Flange screw fitting
Screwdriver for
0.6 x 3.5 mm
1.0 x 5.5 mm
--- Connections
Allen key
3 mm
4 mm
5 mm
--- Connections
Personal protective equipment --- Protection when working on the stack
Table 2: Special tools /auxiliary materials for installation
Space requirement to open the
SR-unit
Flange with tube: L = 240 mm (standard)
Attachment (e.g. 4 steel
pipes, 50 x 5 mm)
for purge air unit
SR-unit
approx. 1500 mm
Min. 700 mm
Angle: Approx. 1°