EasyManuals Logo

SICK GM32 Series User Manual

SICK GM32 Series
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #18 background imageLoading...
Page #18 background image
18
8012707/ZVF9/V2-1/2019-04 | SICKOPERATING INSTRUCTIONS | GM32
Subject to change without notice
3 PREPARING THE GAS DUCT SIDE
3.3 Installing the connection unit
Fig. 5: Connection unit
Line lengths to the GM32 sender/receiver unit according to project planning.
Provide threaded bolts (4) to screw on the connection unit and screw on the connection
unit, see “Connection unit (all dimensions in mm)”, page 77.
!
Do not make the electrical connection to the connection unit yet.
3.4 Installing the purge air unit (for GMP probe)
Length of the purge air hose to the GM32 according to project planning
Installing the purge air unit Operating Instructions of purge air unit.
NOTE: Adequate purge air pressure
Make sure the purge air supply is sufficiently dimensioned to press the purge air into
the gas duct.
If required, please contact SICK Customer Service or your local representative.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SICK GM32 Series and is the answer not in the manual?

SICK GM32 Series Specifications

General IconGeneral
BrandSICK
ModelGM32 Series
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals